Offshore GOM / OCS
SEMS II Offshore Compliance Suite
Full 17-element program compliant with BSEE 30 CFR Part 250 Subpart S and API RP 75 for outer continental shelf operators and contractors.
- All 17 mandatory elements including Stop Work Authority (SWA) and Ultimate Work Authority (UWA).
- Employee Participation Plans (EPP) and reporting unsafe conditions without reprisal.
- Form BSEE-0131 reporting protocols and Corrective Action Plan (CAP) audit workflows.
SEMS II // 30 CFR 250.1900
BSEE / API RP 75
ELEMENT 14: ULTIMATE WORK AUTHORITY (UWA):
Designated PIC: Person-in-Charge retains final authority on facility safety and emergency evacuation.
SWA Integration: Unconditional right of any offshore worker to halt operations upon observing unmitigated risk. Form BSEE-0131 audit tracking active.
SWA Integration: Unconditional right of any offshore worker to halt operations upon observing unmitigated risk. Form BSEE-0131 audit tracking active.
Root Cause & CAPA
Incident Investigation & RCA Manual
Comprehensive incident investigation workflows applying 5-Why, Fishbone (Ishikawa), and Barrier Analysis compliant with OSHA 1904 & EPA RMP.
- Immediate containment, scene preservation, and witness interview forms.
- OSHA 300 / 301 Recordability Decision Trees and regulatory notification logs.
- Corrective & Preventive Action (CAPA) tracking with post-incident verification.
INCIDENT RCA // SECTION 3.2
OSHA 1904 / ANSI Z16.2
5-WHY & BARRIER FAILURE ANALYSIS:
Incident: High-pressure flange failure during hydrostatic test (Reeves Co., TX)
Root Cause: Metallurgy mismatch (Schedule 40 vs. 80 required by P&ID).
CAPA Action: Update warehouse MTR verification hold point and retrain quality technicians.
Root Cause: Metallurgy mismatch (Schedule 40 vs. 80 required by P&ID).
CAPA Action: Update warehouse MTR verification hold point and retrain quality technicians.
Corporate Governance
SMS, QMS & 14-Element PSM
Corporate-wide governance programs built to satisfy ISO 45001, ISO 9001, API Spec Q1/Q2, and OSHA 1910.119 Process Safety Management.
- SMS: Aligned with ANSI/ASSP Z10 & ISNetworld Master RAVSĀ®.
- QMS: Non-Conformance Reporting (NCR) & Material Traceability (MTR).
- PSM: Full Process Safety Information (PSI), PHA/HAZOP, and MOC procedures.
CORPORATE // ISO 45001 / API Q1
AUDIT-READY
QUALITY & PROCESS INTEGRITY:
NCR Workflow: Mandatory quarantine tag affixed within 1 hour of defect discovery.
PSM PHA: What-If / HAZOP multi-disciplinary revalidation every 5 years under OSHA 1910.119(e).
PSM PHA: What-If / HAZOP multi-disciplinary revalidation every 5 years under OSHA 1910.119(e).
Field Execution
Site Safety Plans (SSSP), JSAs & SOPs
Turnkey project and task-level submittals formatted for USACE EM 385-1-1, OSHA 1926/1910, and clearinghouse pre-qualifications.
- SSSP: USACE EM 385-1-1 App A with emergency route and medevac maps.
- JSA/AHA: Step-by-step risk assessment matrix scoring (RAM).
- SOP: Detailed operational sequences with LOTO zero-energy verification.
FIELD OPS // OSHA 1926 / USACE
ACTIVITY HAZARD ANALYSIS
CRITICAL LIFT & EXCAVATION PLAN:
Crane Chart: Lift load calculated at 68% rated capacity.
Trench Box: Type C soil shielding with PE-stamped tabulated data on site.
Trench Box: Type C soil shielding with PE-stamped tabulated data on site.